You Have 1 Item in your Cart. Price is $199

SITC

SITC/ System Integration

Our technical expertise is second to none, allowing us to fully maximise the performance of all aspects of a system installation. We follow the process stated below for ITC activity.

  • First piece is installed by the OEM and watched over by OEM trained and certified Three D Engineers.
  • Second piece is installed by OEM trained and certified Three D engineers and monitored by the OEM Engineers.
  • All subsequent installations are handled by OEM trained and certified Three D Engineers on their own.
  • Once all individual units have been installed, Three D Engineers undertake any system integration activity to assemble the complete unit.
  • Site Acceptance Test can be either jointly handled by both the OEM and Three D Engineers or solely handled by Three D alone.

Supply Of Third Party Items

In an effort to bring the overall cost of the program down, Three D procures third party items required for various Civil and Defence Aviation programs. Three D has well established procedures to procure third party items such as UPS, A/C, Installation Materials, Consumables etc. from local vendors at competitive price. This plays an important role in reducing the cost of system solution and long term maintenance costs thereby maximising our chances of winning.

Powered by:Webfries